Rio Nambe Trail – Trail #160

The Rio Nambe Trail is a 9 mile trail. It begins at the Nambe Reservoir and ends at a junction with the Winsor Trail – Trail #254.

Trail Condition: Good


August 2018

Borrego Trail – Trail #150 to Viejo Trail – Trail #179

From the junction with the Borrego Trail, follow the soutside of the creek downstream. For about 1.8 miles, the

trail crosses the creek a handful of times, and although it is not used, it is largely in good condition. There are some trees down, but not that make passage difficult. At about 1.5 miles, the trail crosses the Rio Capulin. It fades in a large meadow after crossing this tributary, but quickly picks up again on the far side.

NOTE: There should be a junction for the Rio Capulin Trail – Trail #158, but I saw no sign or trail leading up the creek.

After another .3 miles on the north side of the Rio Nambe, you will reach the signed junction for the Viejo Trail.